Traffic alert: 13th St. Bridge closing
Posted: 7:14 am, June 10, 2014 by Publisher Scott Brennan
The 13th Street Bridge between Riverside and Paso Robles Street in Paso Robles will be closed so a city contractor can place the final surfacing on the bridge deck and to install final striping, including bike lanes.
The schedule for the closed bridge is as follows:
- Closes at 8 p.m. June 11; opens at 6 a.m. June 12.
- Closes at 8 p.m. June 12; opens at 6 a.m. June 13.
For questions, please contact Ditas Esperanza, Capital Projects Engineer, at (805) 237-3861, desperanza@prcity.com.
Comments
Posted in: Top Stories
About the author: Publisher Scott Brennan
Scott Brennan is the publisher of this newspaper and founder of Access Publishing. Follow him on Twitter, LinkedIn, or follow his blog.