Detour set as Jack Creek Road closes for bridge work
Closure scheduled from Feb. 24 to Feb. 28
– The San Luis Obispo County Public Works Department will begin initial work on the Jack Creek Road Bridge Replacement Project, located north of Highway 46 and west of Templeton. The work will require the closure of Jack Creek Road at the bridge from 7 a.m. to 3:30 p.m. Feb. 24 through Feb. 28. The road will reopen each day after 3:30 p.m. and will remain open overnight.
The bridge, which spans Paso Robles Creek, will be replaced later this summer. The project is intended to improve safety and reliability for residents and visitors.
During this phase of construction, Jack Creek Road will be closed to all traffic at the bridge, but emergency vehicles will be allowed to cross. Drivers are advised to use the designated detour route via Vineyard Drive. Detour signs will be posted to assist motorists.
For more information about the project, visit https://www.slocounty.ca.gov/departments/public-works/current-public-works-projects/jack-creek-road-bridge-replacement.






