Paso Robles News|Monday, December 17, 2018
You are here: Home » Region » Unit 2 at Diablo Canyon operating at full power
  • Follow Us!

Unit 2 at Diablo Canyon operating at full power 

Diablo Canyon

Pacific Gas and Electric Company’s (PG&E) Diablo Canyon Power Plant Unit 2 has been returned to service and is now operating at 100 percent power.

Unit 2 had been shut down since December 1, when a grid monitoring protective feature detected a lower than normal current on the transmission lines. Upon sensing the operation of the grid protective feature last Saturday, Unit 2 performed as designed and automatically went off line to protect equipment.

Unit 1 is currently operating at 55-percent power due to maintenance activities.

Subscribe to daily news



Join our 5,162 daily email subscribers



Comments

About the author: News Staff

News staff of the Paso Robles Daily News wrote and edited this story from local contributors and press releases. Scott Brennan is the publisher of this newspaper and founder of Access Publishing. Connect with him on , Twitter, LinkedIn, Instagram, or follow his blog. He can be reached at scott@pasoroblesdailynews.com.